1 Australian wide distributor group moved into a new premises in Hallam VIC that had no offices.

Maxio worked closely with them to establish their needs – Meeting Rooms, Enclosed Offices and also a large open workspace. All Maximising the natural lighting and office mezzanine space.

This project also had a tight time-frame due to the client needing to vacate their existing premises.

2 A respected standing financial advisor and homeloan company secured a prime 100m2 office in the CUBE ONE Precinct in Narre Warren.

They had the unique situation of wanting offices for their 2 full time directors as well as a large meeting room for client meetings, comfortable reception area and space offices for any other contacts who may require to rent a room in the future. Along with this, the existing kitchen open kitchen area needed to be made into its own room.

We worked closely with Sally and Andre creating 3D designs, taking them to our furniture showroom and marking out room and furniture sizes in reality in their new space.

3 Maxio was contracted by an established Finance company in Berwick to complete the fitout of their new 2 level offices in South East Melbourne.

Their office space featured a central staircase between the 2 levels which was worked around to create the consulting rooms they needed along with reception on the ground floor and an open office space on level 2.

The look our client was wanting to achieve was industrial and modern. Maxio was able to create this by replacing the existing white tiles with black, paint an epoxy coated concrete floor look and also incorporate a custom built Tasmanian Oak wall behind the reception area. ‘Looks insane, completed on time and trades easy to work with’ was the comment our client made at the completion of this project.

4 A well known Cardiology company asked Maxio to fit out their office with Testing Rooms, Consulting Rooms, Reception and Tea Room. All walls required sound proofing, solid walls and electrical specifications to suit their medical requirements.

Works were completed within the 4 week time frame and all completed within the clients budget.